A Christmas Builder's Tale.
We've been having a lot of work done on the bungalow, mainly involving an extension at the rear, which involved taking a wall out. We also had all the roofing felt replaced, which involved the entire roof being taken off, although one side was done in early September. There were major delays getting started, not helped by living in a modern bungalow, in a conservation area. We finally got started in early November and I wasn't expecting too much before next year.
We ended up needing to have foundations done by piling, so got expensive. After all this they F***** up and the beam on top of the piles was 70mm off level, not a good start. The builder had to level this whilst laying the stonework below the DPC, and we lost more time.
The piling company were also wanting an extra £900 above the quote for none planned work, which I had told them what to do with, but my builder had a go and explained how much work he would have to do to put it right, and they dropped the charges, plus my builder absorbed his costs!
The builder had been declared bankrupt just before we started, adding to the stress. To cut a long story short, I decided to stay with him, as he is still allowed to trade, I like the bloke and he has been great to work with.
He was always very confident about getting to work done quickly, and about a week after his part started in mid November, he reckoned he would have the main job done before Christmas, (i.e. just over a month away).
I was not as confident as him, but we had good luck with the weather and only really lost one day.
Anyway, they did it, and finished the main job today, Christmas Eve.
just missing a bit of trim around the two Velux windows and some other extra jobs still to complete, (couple of patios to build and have only done half the UPVC facias and soffits, which I only added a couple of weeks ago).
The builder and joiner came in today to carry on, but I sent 'em off to the pub with a Christmas bonus.
They have done a really good job at a great price and we are well pleased.
Spent the rest of the day cleaning the house, bloody dust everywhere, only just done.
It's been a great Christmas present, and a surprise to get it done so quick.
So the drinks are on me.
Merry Christmas everybody!
We've been having a lot of work done on the bungalow, mainly involving an extension at the rear, which involved taking a wall out. We also had all the roofing felt replaced, which involved the entire roof being taken off, although one side was done in early September. There were major delays getting started, not helped by living in a modern bungalow, in a conservation area. We finally got started in early November and I wasn't expecting too much before next year.
We ended up needing to have foundations done by piling, so got expensive. After all this they F***** up and the beam on top of the piles was 70mm off level, not a good start. The builder had to level this whilst laying the stonework below the DPC, and we lost more time.
The piling company were also wanting an extra £900 above the quote for none planned work, which I had told them what to do with, but my builder had a go and explained how much work he would have to do to put it right, and they dropped the charges, plus my builder absorbed his costs!
The builder had been declared bankrupt just before we started, adding to the stress. To cut a long story short, I decided to stay with him, as he is still allowed to trade, I like the bloke and he has been great to work with.
He was always very confident about getting to work done quickly, and about a week after his part started in mid November, he reckoned he would have the main job done before Christmas, (i.e. just over a month away).
I was not as confident as him, but we had good luck with the weather and only really lost one day.
Anyway, they did it, and finished the main job today, Christmas Eve.
just missing a bit of trim around the two Velux windows and some other extra jobs still to complete, (couple of patios to build and have only done half the UPVC facias and soffits, which I only added a couple of weeks ago).
The builder and joiner came in today to carry on, but I sent 'em off to the pub with a Christmas bonus.
They have done a really good job at a great price and we are well pleased.
Spent the rest of the day cleaning the house, bloody dust everywhere, only just done.
It's been a great Christmas present, and a surprise to get it done so quick.
So the drinks are on me.
Merry Christmas everybody!
Last edited by HowardQ on Wed Dec 25, 2013 11:13 pm, edited 2 times in total.
HowardQ
Take a ride on the Dark Side
2001 Aprilia Falco in Black
2002 Kawasaki ZX9R F1P
Take a ride on the Dark Side
2001 Aprilia Falco in Black
2002 Kawasaki ZX9R F1P
- blinkey501
- World Champion
- Posts: 3495
- Joined: Sun May 29, 2011 6:28 pm
- Location: near doncaster
I will drink to that howard. I have an old property and know how much muck and dust you get when renovating, this included removing a chimney breast from the loft to the floor in the back room.
I am sure when everything is cleaned up you will be over the moon. I will have a drink of glenmorangie please mate.
I am sure when everything is cleaned up you will be over the moon. I will have a drink of glenmorangie please mate.
Tolerance will be our undoing.
- Aladinsaneuk
- Aprilia Admin
- Posts: 9503
- Joined: Wed Jan 03, 2007 10:37 pm
- Location: Webfoot territory
- Willopotomas
- GP Racer
- Posts: 2256
- Joined: Sat Mar 06, 2010 10:11 pm
- Location: Coventry, ENGLAND
- Willopotomas
- GP Racer
- Posts: 2256
- Joined: Sat Mar 06, 2010 10:11 pm
- Location: Coventry, ENGLAND